Shortened construction period, cost reduction, and follow-up management for safetyPARU fixed structures can be easily assembled through our standardization process which shortens the construction period reducing labor and construction costs.
For efficient operation and management of construction sites, we provide fast delivery schedules and strict follow-up management.
Installation is simple and easy to install in any terrain conditions and slope, which reduces civil engineering costs.
Product competitiveness through automation process
Increase in construction site efficiency through quick supply chain and easy installation.
Excellent quality with self-manufactured products and strict process management
Optimized for mass production thorough our stable supply chain
Extensive knowledge and expertise through various production experiences
Safe structural design and durability
Our standardization process and easy assembly structures shortens construction period, reduces labor and construction costs, enables efficient follow-up management, provide fast delivery schedules, and facilitates installation on any terrain conditions and slopes (reduces civil engineering costs)
01Drilling
02Pile Foundation
03Structure Assembly
04Module Assenbly
05Grouting
06Installation Complete
PosMAC has a corrosion resistance 5 to 10 times higher than that of ordinary applied galvanized steels and can be replaced.
Proposes optimal frame design plan considering possible damage and deformation under various conditions such as wind and snow load
If you have any inquiries about Poduct/Partnership, we will kindly answer you as soon as possible.